Seaport Projects

Port of LA’s Downtown Harbor and Town Square

Port of LA’s Downtown Harbor and Town Square

What was once a parking lot, is now a paradise for pedestrians and boaters at Harbor Boulevard in San Pedro between 5th and 6th streets. Read More

Pier 400 Backlands, Phase II

Pier 400 Backlands, Phase IINEW!

Phase II began in January 2004. This was the second phase of Sully-Miller's Pier 400 project at the Port of Los Angeles - the largest container facility in the world. Read More

Pier 400 Backlands, Phase I

Pier 400 Backlands, Phase INEW!

At the time, the Pier 400 Backlands project at the Port of Los Angeles was the largest undertaking ever for Sully-Miller and Colas. Read More

Berth 100 Backlands Phase I

Berth 100 Backlands Phase INEW!

Redevelopment of 75 acres of land in the West Basin area of the Port of LA Read More

Pier G Maintenance Building, Port of Long Beach

Pier G Maintenance Building, Port of Long BeachNEW!

The Pier G, Maintenance & Repair Building project includes the construction of a new 87,200 SF maintenance and repair building, a 17,500-square-foot reefer wash building, a 10,000 SF West Arrival building, associated car and equipment parking, and a longshore restroom. Read More

Berth 102 Rear Backlands Phase IIB & IIIB

Berth 102 Rear Backlands Phase IIB & IIIBNEW! 

This contract was a part of the phased development of the West Basin China Shipping Container Terminal. Read More

ARCHIVES

image descriptionNews

  • Colas Cup Soccer Tournament

    FULL STORY
  • Sully-Miller Loves Brea

    FULL STORY
  • Supporting Everyday People Going Through Tough Times

    FULL STORY
  • Sully-Miller wins SCCA’s 2015 Excellence in Accident Prevention Award

    FULL STORY

image descriptionStay Connected


image descriptionContact Us

Corporate Office 135 S. State College Blvd., # 400 Brea, CA, 92821 Tel: 714-578-9600 Fax: 714-578-2850 info@sully-miller.com

image descriptionEmployee Links