Route 710 Rehabilitation

This project consisted of rehabilitating a 1.5-mile stretch of the 710 Freeway from the 105 Interstate Interchange to the Firestone Overcrossing. The project is located in the County of Los Angeles, along the 710 Freeway. This freeway is one of the most heavily traveled roadways in California; it is the artery connecting the ports of Los Angeles and Long Beach to the rest of the state. The project was phased by the owner into five separate phases, with the majority of the work to take place in phases two through four.

Sully-Miller Contracting Company performed all grading activities, as well as the excavation and backfill for all structures and roadway excavation on this project.

Sully-Miller also performed all of the asphalt and concrete paving activities and all traffic control operations on the project.

Asphalt Materials were supplied by Blue Diamond Materials.
Aggregate Materials were supplied by United Rock Products.   

ARCHIVES

image descriptionNews

  • Colas Cup Soccer Tournament

    FULL STORY
  • Sully-Miller Loves Brea

    FULL STORY
  • Supporting Everyday People Going Through Tough Times

    FULL STORY
  • Sully-Miller wins SCCA’s 2015 Excellence in Accident Prevention Award

    FULL STORY

image descriptionStay Connected


image descriptionContact Us

Corporate Office 135 S. State College Blvd., # 400 Brea, CA, 92821 Tel: 714-578-9600 Fax: 714-578-2850 info@sully-miller.com

image descriptionEmployee Links