Live Oak Avenue & Arrow Hwy. Improvements - Irwindale, CA

Sully-Miller began from the ground up by installing storm drains and catch basins to tie into existing Los Angeles County Flood Control Channel. Once established, Sully-Miller began creating stamped concrete intersections to handle the heavily-travelled, heavily-loaded truck traffic to accommodate local industrial businesses. Lastly, landscaped medians were constructed along Arrow Hwy and Live Oak Ave. to enhance the views within the community and local businesses.

With Safety as a core value, constant monitoring through our Traffic Control Division was vital to the success of this project with little impact to the local businesses. Our Project Management team ensured that when problems did arise, they were there to ensure a cost-effective solution for the City of Irwindale while keeping the project on schedule.

  • The Asphalt Pavement was supplied by Blue Diamond Material’s Irwindale Plant, a member of the Sully-Miller Group. 
  • The Aggregate Base, topsoil, and fill sand was supplied by United Rock Products, located in the city of Irwindale, which is also a member of the Sully-Miller Group.
ARCHIVES

image descriptionNews

  • Colas Cup Soccer Tournament

    FULL STORY
  • Sully-Miller Loves Brea

    FULL STORY
  • Supporting Everyday People Going Through Tough Times

    FULL STORY
  • Sully-Miller wins SCCA’s 2015 Excellence in Accident Prevention Award

    FULL STORY

image descriptionStay Connected


image descriptionContact Us

Corporate Office 135 S. State College Blvd., # 400 Brea, CA, 92821 Tel: 714-578-9600 Fax: 714-578-2850 info@sully-miller.com

image descriptionEmployee Links