Roads and Highways Projects

Moreno Valley Cactus Avenue and Nason Street Improvement Project

Moreno Valley Cactus Avenue and Nason Street Improvement Project

This project received the 2013 Project of the Year award from the Southern California Chapter of the APWA Read More

Caltrans Route 247, San Bernardino

Caltrans Route 247, San BernardinoNEW!

Sully-Miller overlayed Route 247, provided traffic control and quality assurance. Read More

US 395 Rehabilitation and Rumble Strip Project

US 395 Rehabilitation and Rumble Strip ProjectNEW!

In an unforgiving area of San Bernardino County Sully-Miller worked for approximately 300 days to widen 17 miles of road and make it safer. Read More

Award Winning West Anaheim Street Improvement Project

Award Winning West Anaheim Street Improvement Project NEW! 

Sully-Miller was given a "BEST" award in the category of Transportation by the APWA Southern California Chapter for this project. Read More

Caltrans State Route 127 Project

Caltrans State Route 127 Project NEW!

This Caltrans project was unique because it was a pilot project for achieving maximum smoothness index as facilitated by the FHWA. Read More

State Route 190: Cold In-Place Recycling and HMA Overlay near Olancha

State Route 190: Cold In-Place Recycling and HMA Overlay near OlanchaNEW!

Caltrans I-40 Pavement Rehab & Shoulder Widening - Needles, CA

Caltrans I-40 Pavement Rehab & Shoulder Widening - Needles, CANEW!

Needles, CA: Pavement Rehabilitation and widening of existing shoulder. Installation of an impermeable membrane and construct edge drains along freeway. Placed a new Type C Hot Mix Asphalt. Read More

East Ave Master Plan Storm Drain

East Ave Master Plan Storm DrainNEW!

The East Ave. Master Plan Storm Drain consisted of removing the existing pavement and underlying storm drain infrastructure in order to construct approximately 6,700 linear feet of mainline RCP storm drain, with laterals, catch basins, and appurtenances. Read More

Route 710 Rehabilitation

Route 710 RehabilitationNEW!

This project consisted of rehabilitating a 1.5-mile stretch of the 710 Freeway from the 105 Interstate Interchange to the Firestone Overcrossing. Read More

Live Oak Avenue & Arrow Hwy. Improvements - Irwindale, CA

Live Oak Avenue & Arrow Hwy. Improvements - Irwindale, CANEW!

Sully-Miller began from the ground up by installing storm drains and catch basins to tie into existing Los Angeles County Flood Control Channel. Read More

ARCHIVES

image descriptionNews

  • Colas Cup Soccer Tournament

    FULL STORY
  • Sully-Miller Loves Brea

    FULL STORY
  • Supporting Everyday People Going Through Tough Times

    FULL STORY
  • Sully-Miller wins SCCA’s 2015 Excellence in Accident Prevention Award

    FULL STORY

image descriptionStay Connected


image descriptionContact Us

Corporate Office 135 S. State College Blvd., # 400 Brea, CA, 92821 Tel: 714-578-9600 Fax: 714-578-2850 info@sully-miller.com

image descriptionEmployee Links